Investigation of the Challenger Accident · 1986

IX.DEFINITIONS OF TERMS AND ACRONYMS

IX.DEFINITIONS OF TERMS AND ACRONYMS

AA-SF-Associate Administrator for Space Flight.

AFPRO-Air Force Plant Representative Wice.

APU-Auxiliary Power Unit.

BOC-Base Operations Contractor.

BTU-British Thermal Unit.

CAR-Confguration Acceptance Review.

CDR-Chmmander.

CDR-Critical Design Review.

CIL-Critical Items List.

CoFR-Certification of Flight Readiness.

CPIF-Cost-plus, Incentive-fee.

CTS-Call-to-stations.

DAR-Deviation Approval Request.

DCAS-Defense Contract Administration Service.

DCR-Design Certification Review.

DFRF-Dryden Flight Research Facility.

DR-Discrepancy Report.

EGhG--Edgerton, Germeshausen and Grier.

ESMC-Eastern SDace and Missile Center. ~

EST-Eastern Stahdard Time.

ET-External Tank.

FEAT-Flight Element Assignment Table.

FDO-Flight Dynamics Officer.

FMEA-Failure Modes and Effects Analyses.

FRR-Flight Readiness Review.

FSS-Fixed Service Structure.

GOX-Gaseous oxygen.

GSE-Ground Support Equipment.

H A - H m d Anal

MS. HDP-Holddown 4 O S ~ .

ILL-Impact Limit Line.

IPR-Interim Problem Report.

IR-In fra-red.

IUS-Inertial Upper Stage.

s

JSC-Johnson S ace Center.

KSC-Kennedy pace Center.

hi-thousands of pounds per square inch.

LCG-Launch Control Center.

LFC-Left Forward Center.

L/H-Left Hand.

LOS--Loss of signal.

LOX-Liquid oxygen.

LPS-Launch Processing System.

LRU-Line Replaceable Unit.

MEOP-Maximum Expected Operating Pressure.

MER-Mission Evaluation Room.

254

MLP-Mobile Launch Platform.

MMT-Mission Management Team.

MRB-Material Review Board.

ms-millisecond.

MSFC-Marshall Space Flight Center.

MST-Mountain Standard Time.

NASA-National Aeronautics and Space Administration.

NRC-National Research Council.

NRP-National Resource Protection.

NSTS-National Space Transportation System.

NTD-NASA Test Director.

OASCB-Orbiter Avionics Software Control Board.

OIS-Operational Intercom System.

OM-Operations Manual.

OMI-Operations Maintenance Instruction.

OMP-Operations and Maintenance Plan.

OMRSD-Operations Maintenance Requirements Specification

Document.

OMS-Orbiter Maneuvering System.

OPF-Orbiter Processing Facility.

PAC-Problem Assessment Center.

PAS-Problem Assessment System.

PDR-Preliminary Design Review.

PGHM-Payload Ground Handling Mechanism.

PR-Problem Report.

PRCBD-Program Requirement Change Board Directive.

psig-pounds per square inch gage.

PSP-Processing Support Plan.

QC-Quality Control.

RCS-Reaction Control System.

R.F.-Radio Frequency.

RPSF-Rotation, Processing and Surge Facility.

RSO-Range Safety Officer.

RSS-Range Safety System.

RSS-Rotating Service Structure.

RTLS-Return to Launch Site.

SCA-Shuttle Carrier Aircraft.

SPC-Shuttle Processing Contractor.

SRB-Solid Rocket Booster.

SRM-Solid Rocket Motor.

SR&QA-Safety, Reliability and Quality Assurance.

SSME-Space Shuttle Main Engine.

STS-Space Transportation System.

TBD--to be determined.

TDRS-Tracking and Data Relay Satellite.

TM-Telemetry.

TSR-Technical Status Review.

TVC-Thrust Vector Control.

VAB-Vehicle Assembly Building.

VPF-Vertical Processing Facility.

WAD-Work Authorization Document.

255

APPENDICES

V-A