Investigation of the Challenger Accident · 1986
IX.DEFINITIONS OF TERMS AND ACRONYMS
IX.DEFINITIONS OF TERMS AND ACRONYMS
¶AA-SF-Associate Administrator for Space Flight.
¶AFPRO-Air Force Plant Representative Wice.
¶APU-Auxiliary Power Unit.
¶BOC-Base Operations Contractor.
¶BTU-British Thermal Unit.
¶CAR-Confguration Acceptance Review.
¶CDR-Chmmander.
¶CDR-Critical Design Review.
¶CIL-Critical Items List.
¶CoFR-Certification of Flight Readiness.
¶CPIF-Cost-plus, Incentive-fee.
¶CTS-Call-to-stations.
¶DAR-Deviation Approval Request.
¶DCAS-Defense Contract Administration Service.
¶DCR-Design Certification Review.
¶DFRF-Dryden Flight Research Facility.
¶DR-Discrepancy Report.
¶EGhG--Edgerton, Germeshausen and Grier.
¶ESMC-Eastern SDace and Missile Center. ~
¶EST-Eastern Stahdard Time.
¶ET-External Tank.
¶FEAT-Flight Element Assignment Table.
¶FDO-Flight Dynamics Officer.
¶FMEA-Failure Modes and Effects Analyses.
¶FRR-Flight Readiness Review.
¶FSS-Fixed Service Structure.
¶GOX-Gaseous oxygen.
¶GSE-Ground Support Equipment.
¶H A - H m d Anal
¶MS. HDP-Holddown 4 O S ~ .
¶ILL-Impact Limit Line.
¶IPR-Interim Problem Report.
¶IR-In fra-red.
¶IUS-Inertial Upper Stage.
¶s
¶JSC-Johnson S ace Center.
¶KSC-Kennedy pace Center.
¶hi-thousands of pounds per square inch.
¶LCG-Launch Control Center.
¶LFC-Left Forward Center.
¶L/H-Left Hand.
¶LOS--Loss of signal.
¶LOX-Liquid oxygen.
¶LPS-Launch Processing System.
¶LRU-Line Replaceable Unit.
¶MEOP-Maximum Expected Operating Pressure.
¶MER-Mission Evaluation Room.
254¶MLP-Mobile Launch Platform.
¶MMT-Mission Management Team.
¶MRB-Material Review Board.
¶ms-millisecond.
¶MSFC-Marshall Space Flight Center.
¶MST-Mountain Standard Time.
¶NASA-National Aeronautics and Space Administration.
¶NRC-National Research Council.
¶NRP-National Resource Protection.
¶NSTS-National Space Transportation System.
¶NTD-NASA Test Director.
¶OASCB-Orbiter Avionics Software Control Board.
¶OIS-Operational Intercom System.
¶OM-Operations Manual.
¶OMI-Operations Maintenance Instruction.
¶OMP-Operations and Maintenance Plan.
¶OMRSD-Operations Maintenance Requirements Specification
¶Document.
¶OMS-Orbiter Maneuvering System.
¶OPF-Orbiter Processing Facility.
¶PAC-Problem Assessment Center.
¶PAS-Problem Assessment System.
¶PDR-Preliminary Design Review.
¶PGHM-Payload Ground Handling Mechanism.
¶PR-Problem Report.
¶PRCBD-Program Requirement Change Board Directive.
¶psig-pounds per square inch gage.
¶PSP-Processing Support Plan.
¶QC-Quality Control.
¶RCS-Reaction Control System.
¶R.F.-Radio Frequency.
¶RPSF-Rotation, Processing and Surge Facility.
¶RSO-Range Safety Officer.
¶RSS-Range Safety System.
¶RSS-Rotating Service Structure.
¶RTLS-Return to Launch Site.
¶SCA-Shuttle Carrier Aircraft.
¶SPC-Shuttle Processing Contractor.
¶SRB-Solid Rocket Booster.
¶SRM-Solid Rocket Motor.
¶SR&QA-Safety, Reliability and Quality Assurance.
¶SSME-Space Shuttle Main Engine.
¶STS-Space Transportation System.
¶TBD--to be determined.
¶TDRS-Tracking and Data Relay Satellite.
¶TM-Telemetry.
¶TSR-Technical Status Review.
¶TVC-Thrust Vector Control.
¶VAB-Vehicle Assembly Building.
¶VPF-Vertical Processing Facility.
255APPENDICES
¶V-A