Columbia Accident Investigation Board Report, Volume I
ENGINEERING BY VIEWGRAPHS
ENGINEERING BY VIEWGRAPHS
¶The Debris Assessment Team presented its analysis in a formal briefing to the Mission Evaluation Room that relied on Power- Point slides from Boeing. When engineering analyses and risk assessments are condensed to fit on a standard form or overhead slide, information is inevitably lost. In the process, the priority assigned to information can be easily misrepresented by its placement on a chart and the language that is used. Dr. Edward Tufte of Yale University, an expert in information presentation who also researched communications failures in the Challenger accident, studied how the slides used by the Debris Assessment Team in their briefing to the Mission Evaluation Room misrepresented key information.38
¶The slide created six levels of hierarchy, signified by the title and the symbols to the left of each line. These levels prioritized information that was already contained in 11 simple sentences. Tufte also notes that the title is confusing. "Review of Test Data Indicates Conservatism" refers not to the predicted tile damage, but to the choice of test models used to predict the damage.
¶Only at the bottom of the slide do engineers state a key piece of information: that one estimate of the debris that struck Columbia was 640 times larger than the data used to calibrate the model on which engineers based their damage assessments. (Later analysis showed that the debris object was actually 400 times larger). This difference led Tufte to suggest that a more appropriate headline would be "Review of Test Data Indicates Irrelevance of Two Models." 39
Review Of Test Data Indicates Conservatism for Tile Penetration
- The existing SOFI on tile test data used to create Crater was reviewed along with STS-107 Southwest Research data
– Crater overpredicted penetration of tile coating significantly • Initial penetration to described by normal velocity Varies with volume/mass of projectile(e.g., 200ft/sec for 3cu. In) • Significant energy is required for the softer SOFI particle to penetrate the relatively hard tile coating Test results do show that it is possible at sufficient mass and velocity • Conversely, once tile is penetrated SOFI can cause significant damage Minor variations in total energy (above penetration level) can cause significant tile damage – Flight condition is significantly outside of test database • Volume of ramp is 1920cu in vs 3 cu in for test
¶2/21/03
¶Tufte also criticized the sloppy language on the slide. "The vaguely quantitative words ʻsignificantʼ and ʻsignificantlyʼ are used 5 times on this slide," he notes, "with de facto meanings ranging from ʻdetectable in largely irrelevant calibration case studyʼ to ʻan amount of damage so that everyone diesʼ to ʻa difference of 640-fold.ʼ " 40 Another example of sloppiness is that "cubic inches" is written inconsistently: "3cu. In," "1920cu in," and "3 cu in." While such inconsistencies might seem minor, in highly technical fields like aerospace engineering a misplaced decimal point or mistaken unit of measurement can easily engender inconsistencies and inaccuracies. In another phrase "Test results do show that it is possible at sufficient mass and velocity," the word "it" actually refers to "damage to the protective tiles."
¶As information gets passed up an organization hierarchy, from people who do analysis to mid-level managers to high-level leadership, key explanations and supporting information is fil- tered out. In this context, it is easy to understand how a senior manager might read this PowerPoint slide and not realize that it addresses a life-threatening situation.
¶At many points during its investigation, the Board was surprised to receive similar presentation slides from NASA officials in place of technical reports. The Board views the endemic use of PowerPoint briefing slides instead of technical papers as an illustration of the problematic methods of technical communication at NASA.
The vaguely quantitative words "significant" and "significantly" are used 5 times on this slide, with de facto meanings ranging from "detectable in largely irrelevant calibration case study" to "an amount of damage so that everyone dies" to "a difference of 640-fold." None of these 5 usages appears to refer to the technical meaning of "statistical significance." The low resolution of PowerPoint slides promotes the use of compressed phrases like "Tile Penetration." As is the case here, such phrases may well be ambiquous.
(The low resolution and large font generate 3 typographic orphans, lonely words dangling on a seperate line.)
This vague pronoun reference "it" alludes to damage to the protective tiles,which caused the destruction of the Columbia. The slide weakens important material with ambiquous language (sentence fragments, passive voice, multiple meanings of "significant"). The 3 reports
were created by engineers for high-level NASA officials who were deciding whether the threat of wing damage required further investigation before the Columbia attempted return. The officials were satisfied that the reports indicated that the Columbia was not in danger,
¶and no attempts to further examine the threat were
made. The slides were part of an oral presentation and also were circulated as e-mail attachments. In this slide the same unit of measure for volume (cubic inches) is shown a different way every time 3cu. in 1920cu. in 3 cu. in rather than in clear and tidy exponential form 1920 in 3 . Perhaps the available font cannot show exponents. Shakiness in units of measurement provokes concern. Slides that use hierarchical bullet-outlines here do not handle statistical data and scientific notation gracefully. If PowerPoint is a corporate-mandated format for all engineering reports, then some competent scientific typography (rather than the PP market-pitch style) is essential. In this slide, the typography is so choppy and
¶clunky that it impedes understanding. The analysis by Dr. Edward Tufte of the slide from the Debris Assessment Team briefing. [SOFI=Spray-On Foam Insulation] who might have cautioned against using Crater so far outside its validated limits. Nor did safety personnel provide any additional oversight. NASA failed to connect the dots: the engineers who misinterpreted Crater – a tool already unsuited to the task at hand – were the very ones the Shuttle Program identified as engendering the most risk in their transition from Huntington Beach. The Board views this example as characteristic of the greater turbulence the Shuttle Program experienced in the decade before Columbia as a result of workforce reductions and management reforms.
192¶Mission Management Team Shortcomings
¶In the Boardʼs view, the decision to fly STS-113 without a compelling explanation for why bipod foam had separated on ascent during the preceding mission, combined with the low number of Mission Management Team meetings during STS-107, indicates that the Shuttle Program had become overconfident. Over time, the organization determined it did not need daily meetings during a mission, despite regulations that state otherwise.
¶Status update meetings should provide an opportunity to raise concerns and hold discussions across structural and technical boundaries. The leader of such meetings must encourage participation and guarantee that problems are assessed and resolved fully. All voices must be heard, which can be difficult when facing a hierarchy. An employeeʼs location in the hierarchy can encourage silence. Organizations interested in safety must take steps to guarantee that all relevant information is presented to decision-makers. This did not happen in the meetings during the Columbia mission (see Chapter 6). For instance, e-mails from engineers at Johnson and Langley conveyed the depth of their concern about the foam strike, the questions they had about its implications, and the actions they wanted to take as a follow-up. However, these e-mails did not reach the Mission Management Team.
¶The failure to convey the urgency of engineering concerns 7.6 was caused, at least in part, by organizational structure and spheres of authority. The Langley e-mails were circulated among co-workers at Johnson who explored the possible effects of the foam strike and its consequences for landing. Yet, like Debris Assessment Team Co-Chair Rodney Rocha, they kept their concerns within local channels and did not forward them to the Mission Management Team. They were separated from the decision-making process by distance and rank.
¶Similarly, Mission Management Team participants felt pres- sured to remain quiet unless discussion turned to their particular area of technological or system expertise, and, even then, to be brief. The initial damage assessment briefing prepared for the Mission Evaluation Room was cut down considerably in order to make it "fit" the schedule. Even so, it took 40 minutes. It was cut down further to a three-minute discussion topic at the Mission Management Team. Tapes of STS-107 Mission Management Team sessions reveal a no- F7.1-1 ticeable "rush" by the meetingʼs leader to the preconceived bottom line that there was "no safety-of-flight" issue (see Chapter 6). Program managers created huge barriers against dissenting opinions by stating preconceived conclusions based on subjective knowledge and experience, rather than
¶on solid data. Managers demonstrated little concern for mission safety.
¶Organizations with strong safety cultures generally acknowledge that a leaderʼs best response to unanimous consent is to play devilʼs advocate and encourage an exhaustive debate. Mission Management Team leaders failed to seek out such minority opinions. Imagine the difference if any Shuttle manager had simply asked, "Prove to me that Columbia has not been harmed."
¶Similarly, organizations committed to effective communication seek avenues through which unidentified concerns and dissenting insights can be raised, so that weak signals are not lost in background noise. Common methods of bringing minority opinions to the fore include hazard reports, sug- gestion programs, and empowering employees to call "time out" (Chapter 10). For these methods to be effective, they must mitigate the fear of retribution, and management and technical staff must pay attention. Shuttle Program hazard reporting is seldom used, safety time outs are at times disre- garded, and informal efforts to gain support are squelched. The very fact that engineers felt inclined to conduct simulated blown tire landings at Ames "after hours," indicates their reluctance to bring the concern up in established channels.
¶Safety Shortcomings
¶The Board believes that the safety organization, due to a lack of capability and resources independent of the Shuttle Program, was not an effective voice in discussing technical issues or mission operations pertaining to STS-107. The safety personnel present in the Debris Assessment Team, Mission Evaluation Room, and on the Mission Management Team were largely silent during the events leading up to the loss of Columbia. That silence was not merely a failure of safety, but a failure of the entire organization.